AUO G8.5 Fab Phase I

Building its second G8.5 facility in Central Taiwan Science Park, AUO plans to execute three phases of construction to bring three factory plants and associate service areas into the 55.3 hectare site. Fab L8B built in phase I is awarded a green factory label and has achieved the distinction of being the first factory building obtaining a diamond certification in Green Building in the country.

Phase I includes programs such as the main factory, mechanical device areas, module fabrication areas, offices, and a data bank. Apart from fulfilling the essential circulatory condition for each production line, users are provided with a comfortable and refreshing work environment endowed with lush landscape. The facade adopts AUO’s typical building expression, demonstrating an elegant yet clean exterior with carefully handled finishing. In order to encourage staff interaction and neighborhood friendliness, a multifunctional green space is located within the site to hold large-scale events and fairs.

Location: Central Taiwan Science Park

Structural system: RC, Steel

Site area: 553,200㎡

Building coverage: 126,965㎡

Total floor area: 571,100㎡

No. of stories: 3 below, 7 above grade

Design period: 2008.1 ~ 2011.5

Const. period: 2008.4 ~ 2011.5

類別: Manufacturing