Building B & C, Trend Tone Imaging, Inc

There are two phases of this project: Building B & Building C and aim to provide the service of manufacturing and office area

Located at a busy corner in Hsinchu Science Park, the site possesses great convenience and geological benefits. Building C situates along with the existing building B on its north-east side. Considering spatial efficiency and functional relativity, the two buildings will be connected through bridges on each floor. The 12-meter long entrance on the south-east side acts as a service entrance for both building, accessing to loading dock and cargo area on ground floor.

Parking is located on B1 floor, which connects and shares parking entrance with building B. The building consists of 5 stories above ground, which includes loading dock and cargo area on the 1st floor, storage on the 2nd floor, office on the 3rd floor, and production area on the 4th and 5th floor respectively. Each floor is equipped with a working balcony to ensure smooth cargo portage.

Colors of the metal panels used on the exterior walls are chosen to match with the exterior expression on building B. Together with hierarchy created by building massing and materials, conveys a simple yet energetic rhythm.

Location: Hsinchu Science Park

Structural system: SS

Site area: 5,667 Building coverage

Building coverage: Building B: 1,381 ㎡ Building,C: 1,309 ㎡

Total floor area: Building B: 8,060 ㎡,Building C: 8,060 ㎡

No. of stories: 1 below, 5 above grade

Design period: Building B: 2003.11~2004.02,Building C: 2009.08 ~ 2010.01

Const. period: Building B: 2004.05~2005.11,Building C: 2010.02~2011.03

類別: Manufacturing

Share This: