Ho Chi Minh City Light Rail Transit System

This project is located in the capital of Vietnam consisting of a 9-km railway, that connects the first, fifth, sixth, and Binh Tan district. The planning was completed in 2008.

The initial design simulation of the stations absorbs the change brought by this system into the local city, including the platforms, ferry wheel dock, riverbank landscape, pedestrian sky bridge, hospitality, traditional markets, parks, etc. The design also employs the co-development station and elevated station, to reduce the visual impact of transportation and deliver a much more convenient pedestrian system.

This project not only provides the stations’ simulation of the construction needs, but respects the vernacularism and facilitates the urban benefits, thus reflects the surrounding environment.

座落地點: 越南胡志明市

輕軌線始點: Bach Dang Quay, 第一區 (Bach Dang公園)

輕軌線終點: Mien Tay 巴士站, Binh Tan區

輕軌線線路範圍: 第1、5、6區以及Binh Tan區

類別: Commercial / Mixed Use、Transportation / Infrastructure

Share This: