New Plant for the Getac Corporation, Hsinchu

Located on Tron-hsin First Road in the Science Based Industrial Park, the primary function of this plant is the production of accessory computer ware. The structure, of reinforced concrete construction, has 2 floors below and 6 floors above ground. Basement floors contain parking, storage and an air-raid shelter area, ground to 3rd floor areas are production factories, while research and development, administration and exhibition spaces, as well as a staff dining hall recreation are arranged on the 4th through 6th floor. Exterior walls are finished in 4.5 cm square glazed tiles, with a metal and glass curtain wall glazing the two story high lobby, aiming to produce a simple, serene and distinguished effect.

Completion date for construction 1998. the total floor area is 18,200 sq.m., with a construction cost of around NT$ 230,000,000.

類別: Manufacturing

Share This: